KM Deepwater Bulk Terminal LAYBERTH PURPOSES ONLY
@ Kinder Morgan Petcoke L.P.
 
Main Telephone: 281-478-5588
Operations Fax: 281-478-5631
Email: william_greenough@kindermorgan.com
 
Dock Information:                          
      HEADING   CONNECTIONS   PSI@MFOLD   AIR DRAFT   LOA BEAM DRAFT BCM SALINITY
Main Berth  Master's option Bulk N/A 750 ft 106 40 ft  M.L.T. BW
                               
Dock Facilities:                            
Gangway use: Vessel DOCKAGE
Bunkering via Shoreline: No LOA $ Rate per foot
0-199 2.83
Bunkering via Barge: Acceptable only with prior KM approval 200-399 3.35
Minimum charge of $3,500 and includes the first four (4) hours of pumping per barge. 400-499 4.40
An additional $350 per hour thereafter applies. Each additional barge or launch 500-599 6.04
will be charged at $2,000 per unit with $350 per hr. after the first 4 hrs. 600-699 6.44
700-799 7.73
Ship's stores at dockside: Yes 800-899 9.01
900 + 10.3
Ship's stores via barge: Yes as of May-08
Minimum charge is for twenty-four (24) hours dockage
Fresh water available:
Slop Discharge Facility: No
Linehandlers:
Transit time from Galveston Seabuoy to All Fast:
Shore Line:
Gate Pass Required:
COMMENTS:                           1) Terminal security fee of $500 flat rate 
        2) Berth app. Must be filed with KM Deepwater directly
        3) Gas free certificate required by marine chemist if any hot work or cutting is to be performed
4) Minimum mooring arrangement assumes a sixteen point mooring line deployment with 3 forward lines, 
2 forward breast lines, 3 forward spring lines, 3 aft spring lines, 2 aft breast lines, and 3 aft lines
Please note: this information is correct to the best of our knowledge on   August 15, 2008