| IMTT Gretna | (mm 97.2) | West Bank | |||||||||||||
| 1145 Four St | |||||||||||||||
| Harvey, LA 70058 | |||||||||||||||
| Main Telephone: | 504-368-2560 | groperations@imtt.com | |||||||||||||
| Operations Fax: | 504-469-8699 | ||||||||||||||
| Gretna Ops Director: | Billy Mercier | cell) 504-339-5009 | Home) 504-398-0123 | ||||||||||||
| Dock Coordinators: | Tommy Hebert | 504-468-3997 ext: 113 | |||||||||||||
| ATM | 504-468-3997 ext: 114 | ||||||||||||||
| Dir Mkting/Scheduling: | Rene Gurdian | 504-468-3997 ext: 107 | cell: | 504-462-1360 | direct line: | 504-463-2407 | |||||||||
| Dock Information: | |||||||||||||||
| HEADING | CONNECTIONS | PSI@MFOLD | AIR DRAFT | LOA | BEAM | DRAFT | BCM | SALINITY | |||||||
| Dock 1 | Portside to | 2 x 10 in | 100 | 850 ft | 135 | 60 ft FW | 425 | FW | |||||||
| chicksans | dependent on SW Pass | ||||||||||||||
| w/ 8 in reducers | 100,000 DWT | ||||||||||||||
| Vsl. may remove/replace | |||||||||||||||
| Vsl. Will remove/replace hoses | |||||||||||||||
| 1 x 8 in hose downriver (aft of manifolds) | Dockman will not come aboard | ||||||||||||||
| Dock Facilities: | |||||||||||||||
| Gangway use: | Vsl must provide | ||||||||||||||
| Bunkering via Shoreline: | Yes | ||||||||||||||
| Bunkering via Barge: | Bunkers: | Flat fee usd $1500 | |||||||||||||
| Lubes: | Flat fee usd $500 | ||||||||||||||
| Ship's stores at dockside: | No | Only tools / supplies for repairs critical to ships movement | |||||||||||||
| All other items by launch | |||||||||||||||
| Ship's stores via barge: | Yes | ||||||||||||||
| Fresh water available: | Yes | Flat Fee usd $750 | |||||||||||||
| Slop Discharge Facility: | No | ||||||||||||||
| Linehandlers: | Cooper / T. Smith 504-945-1772 | ||||||||||||||
| Transit time from SW Pass to All Fast: | 12 hrs | ||||||||||||||
| Gate Pass required | Yes | * No crew shore leave authorized via dockside; only via launch * | |||||||||||||
| COMMENTS: | 1/ Security regulations, can only park at foot of levee. | ||||||||||||||
| 2/ No crew liberty at this dock | |||||||||||||||
| 3/ Security Fee: usd $600 per day (security form must be faxed to 504-436-4438 prior to vsl arrival) | |||||||||||||||
| 4/ One or Two standby tugs may be required if river stage in excess on 12'-6" (vsl over 500 ft) | |||||||||||||||
| 5/ USCG exam / tml Charges usd $5000 | |||||||||||||||
| 6/ Dockman will not board vessel for any reason. Vsl must come to dockhouse for signing of NOR; | |||||||||||||||
| vessel will be required to complete and sign a Declaration of Inspection before the start of cargo | |||||||||||||||
| operations and at each shift change. | |||||||||||||||
| Port Facility Officer: | Darryl Daigs | tel) 504-368-2560 | |||||||||||||
| Please note: this information is correct to the best of our knowledge on August 15, 2008. | |||||||||||||||