Stolt Haven Terminal
15602 Jacintoport  Blvd.
Houston, Tx. 77015
 
Main Telephone: 281-860-6880 To get tender number: 281-860-6856
Operations Fax: 281-860-6850
Dock Coordinators: Ron Allsbrooks Direct Line: 281-860-6880 r.allsbrooks@stolt.com
Scott Burnett s.burnett@stolt.com
24hrs: 281-860-6856
Dock Information:                          
      HEADING   CONNECTIONS   PSI@MFOLD   AIR DRAFT   LOA BEAM DRAFT BCM SALINITY
Dk # 2 Master's Option 6 / 8in Hoses 100 nil 860 ft 140 ft 40 ft BW
          1 x 6in for Cornoil                    
Dk # 3 Master's Option 6 / 8in Hoses 100 nil 860 ft 140 ft 40 ft BW
Dock Facilities:                            
Gangway use: Vsl must provide ( security fee:  USD 600.00 )
Bunkering via Shoreline: Available thru Matrix (currently must use barge for HFO) ( USD 6.01 per mt )
Bunkering via Barge: Yes ( USD 3.31 per mt )
Ship's stores at dockside: Yes Manually to Dockside (must have TWIC) - No Ship Hands
Ship's stores via barge: Yes usd $850 p/barge
Fresh water available: Yes usd $580 flat for unlimited
Slop Discharge Facility: Yes coordinate via Kortnery Joyner 281-860-6803 kjoyner@stolt.com
Bill  Pftsterer     281-860-6880
Linehandlers: Houston Mooring
Transit time from Galveston Seabuoy to All Fast: 4  hours
Shore Line: Yes - Shuttel Bus usd $600 fee
Gate Pass Required: Yes fax gatepass to:  ( 281-457-6151 )
COMMENTS: Layberth: Yes
1/ All vessels must tender NOR before arrival; do not tender if at another berth and hoses/arms connected;
usd $5000 fine will be assessed.
2/ Layberth Cost:
LOA in Ft. Rate p/ft per 12hr period
0-500 $5.10
501-550 $6.01
551-600 $6.91
601-700 $7.81
701-800 $9.01
801-860 $11.11
3/ Bunkering Charges: minimum charge usd $1150
0-1000mt $3.31
1001-2500mt $3.30
2501-5000mt $2.70
>5000mt $2.40
4/  See Stolthaven Tariff for a complete list of layberth costs
Please note: this information is correct to the best of our knowledge on 6/21/2011.