Oil Tanking Terminal of Houston, Inc.
15602 Jacintoport Blvd
Houston, Texas 77213 29-74 N / 95-13 W
 
Main Telephone: 281-451-7900
Operations Fax: 281-457-7990
Terminal Manager: Mark Jeanes 281-457-7909
PFSO: Bart Bundy 281-457-7914
Dock Coordinators: Marsha Watkins Direct Line: 281-457-7937
Craig Bertsch 281-457-7934
Mitch Berry 281-457-7945
Chad *** 281-457-7994
Dock Foreman: CONTROL  ROOM 281-457-7979
Gate Guard 281-832-0931
Gate fax # 281-457-6151
Dock Information:                          
      HEADING   CONNECTIONS   PSI@MFOLD   AIR DRAFT   LOA BEAM DRAFT BCM SALINITY
Dk #1 Head in clean: 2x16in 125 lbs 56 ft 860 ft 160 ft 40 ft None FW
Portside to max dwt 128,000
Dk #4 Stern in 3x16in 125 lbs 56 ft 900 ft 160 ft 40 ft None FW
Portside to Chicksans max dwt 160,000
Dk #5 Stern in 3x16in 125 lbs 56 ft 950 ft 175 ft 45 ft None FW
Stbdside to Chicksans max dwt 160,000
Dk # 6 Stern in 2 x 16in 64 ft 950 ft 175 ft 45 ft FW
Portside to Chicksans max dwt 160,000
Dk # 7 Stern in 2 x 16in 64 ft 950 ft 160 ft 40 ft FW
Stbdside to Chicksans max dwt 160,000
Dk #8 Stern in 2x8in 125 lbs 54 ft 750 ft 120 ft 40 ft None FW
Portside to Chicksans max dwt 128,000
Dock Facilities:                            
Gangway use: Terminal Requires Use $ 1250 first 48 hrs /  $ 500 each day after 48 hrs.
Bunkering via Shoreline: Matrix Marine only (281)457-7924
Bunkering via Barge: MGO from Matrix Marine, ( or Lubes only ) $ 1000.00/barge
Lube oil Barge alongside usd   1000
Ship's stores at dockside: Yes usd $ 750.00 $300.00/hr for use of shore crane
Lube oil drums not allowed down dock. ONLY  between  hours   07:00 - 16:00 by tml. Security
Other hours must supply  TWIC personnel
Tml. Mobile crane rental:   $ 500 p/hour = 1 hr min., / $ 250 per each 1/2 hr after  1 hour
Ship's stores via barge: EMAIL    OTHI Yes usd $ 750.00 / included above
Fresh water available Yes $ 2.00 per 1,000 gallons /  minimum usd $ 500
Slop Discharge Facility: Oily residues only Bart  Bundy        281-457-7914
Will not accept hazardous waste or noxious liquid substances (NLS)
24 hrs notice / with quantity & quality disignations.
OTHI  will advise minimum charge for discharge ashore if approved.
Tml. Charge  slop barge alongside  usd  $  1000  
Garbage Tml. Reception Ship garbage only /  does not include hazardous waste of any type.
24 hour notice /  Tml. Will contact their contractor /  billing to  agency
Linehandlers: Agent's Choice
Transit time from Galveston Seabuoy to All Fast: 6.0 Hours
Shore Line: 24in line 1, 4, 5, & 8 30in line for Condensate / Crude @ 6 & 7
Gate Pass Required: Yes
COMMENTS:
1/ Available as layberth, tariff per Port of Houston Authority rates
2/ Dockage:  700-799 loa x $ 7.00
800-899 loa x $ 8.50
3/ Terminal  charge security fee flat rate of  usd $  500  
opshouston@camincargo.com
AMPD Coverage:  None 713-910-4688 / 877-289-8400  Camin
281-452-1011 / 713-844-3200  Caleb Brett
281-452-4270  Inspectorate
Please note: this information is correct to the best of our knowledge on Jan 5, 2011 281-479-7170  SGS