USHOU 5301
Odfjell Terminals  (Houston) LP Lat: 29° 36' 27.84" N 
12211  Port  Road Long: 95° 1' 12.23" W 
Seabrook, Tx.  77586
 
Main Telephone: 713-844-2300
Operations Fax: 713-844-2355
Marine Coordinators: Marcia Tifdel Direct line: 713-844-2392 Hou.Logistics@odfjell.com
Dock Information:                          
      HEADING   CONNECTIONS   PSI@MFOLD   AIR DRAFT   LOA BEAM DRAFT BCM SALINITY
Dk # 1 Master's Hoses 125  lb 650 ft Nil 40 ft BW
Lat: 29° 36' 29.10" N
Long: 95° 1' 6.81" W      Choice   6 & 8 in           *   **    
Dk # 2 Starbord Hoses 125  lb 650 ft Nil 37 ft BW
Lat: 29° 36' 26.65" N  Side to 6 & 8 in * **
Long: 95° 1' 3.59" W   *Larger on request **Max chnl.Draft / not berth draft
Dock Facilities:         6  inch   Vapor Recovery            
Gangway use: Vessel
Bunkering via Shoreline: Yes Matrix Marine Fuels  (281-457-7822 *** 7920 )  marketing@matrixmarine.com
Bunkering via Barge: Yes Tml.  Fee  tanker trucks   usd  $  1500  //   
Tml.  Fee   barge   usd  $  2500  
Ship's stores at dockside: Yes Terminal   fee  light trucks / van   usd  $  450               1 ton fixed dock crane usd 400 / hr - min. usd 800
Terminal   fee  medium (bobtail or stake bed)  usd $  650  5 ton Cherry Picker usd 650 /hr - min. $ 1300
Terminal   fee  heavy trucks  (box or flatbed trailers ) usd $  1100  2 ton  Fork lift  usd 350 / hr - min.  $ 700
                LABOR: $ 100 p/hr  ***   $ 150 p/hr overtime
Ship's stores via barge: Yes Tml. Fee  ( work  or  ) supply barge  usd  $  2000              cancelled call out $600 p/ operator- rigger
                               
Fresh water available: No Tml. Fee tank trucks w/water  usd $ 1250 
Slop Discharge Facility: Depends But not very often Drew  Wharton 713-844-2367
MARPOL  V  APHIS to truck or barge $ 1275  per vehicle
MARPOL  I & II  waste to truck: $ 1375  per vehicle
MARPOL  1 & II  wast to barge: $ 4.00 p/ mt,  min.  $ 3000
MARPOL  waste to OTH: $ 0.40 per gallon,  min.  $  3000
Linehandlers: Terminal usd  $   1900   cancel  less than 2 hours  usd $ 600
Transit time from Galveston Seabuoy to All Fast: 3 hours
Shore Line:
Gate Pass Required: Yes Send by fax during working hrs only   Gatepass fax: 713-844-2388
COMMENTS: 1)    Layberth : for bunkering / inspections
2)    All visitors must be on approved Insurance List.   Mernie Bimslager (713-844-2341) 
(check with guard gate) Mernie.Bimslager@Odfjell.com
3) Terminal security fee  usd  $  250
4) Terminal  charge usd  $  150   per  Crew change
5) Nitrogen ambient usd $ 2.10  p/ 100 standard cubic foot
hot usd $ 3.25  p/ 100  standard cubic foot
Please note: this information is correct to the best of our knowledge on  July  07,  2010.