|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| USHOU |
5301 |
|
|
Lat: 29° 43' 29.10"
N |
|
| EXXONMOBILE
BAYTOWN |
Long: 95° 1' 8.41"
W |
|
| |
|
| |
|
btrfdocks@exxonmobil.com |
|
| 29.433
N /
95.0112 W |
|
|
| Main
Telephone: |
281-834-4452 |
Dock Coordinators: |
|
| Operations
Fax: |
281-834-3539 |
281-834-4452 |
|
| Scheduler:
(Virginia) |
703-846-6773 |
Sue 281-834-4526 |
|
|
| Gate: |
|
281-834-4002 |
|
| Marine
Sup: |
Bill Hennessy |
|
|
|
william.s.hennessey@exxonmobil.com |
|
| 281-834-3202 / fax# 281-834-3162 / cell#
281-229-1072 |
|
| Dock
Information: |
john.w.pace@exxonmobil.com |
|
|
|
|
|
|
|
FW |
|
|
| |
|
|
HEADING |
|
CONNECTIONS |
|
PSI@MFOLD |
|
AIR DRAFT |
|
LOA |
BEAM |
DRAFT |
displacement |
SALINITY |
| (#2 dock) |
|
# 1 |
Stbdside to |
|
1x8 in Jet Fuel |
|
125 lbs |
|
62'8" |
|
800 ft |
105 |
41 |
42,000 lt |
FW |
|
# 2 |
|
|
1x10in Unl. Gas. |
|
|
|
|
41 |
42,000 lt |
|
|
# 3 |
|
|
1x10in Vapour Rec. |
|
|
|
|
41 |
32,000 lt |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| DK. 5 /
berth 5 |
# 5 |
Stbdside to |
|
2 x 12 (VGO) |
|
125 lbs |
|
none |
|
|
43.5 |
120,000 lt |
|
| Lat:
29° 43' 43.77" N |
|
|
|
|
|
|
|
|
|
|
| Long:
95° 1' 19.92" W |
|
|
|
|
max 50,000 bph |
|
|
|
|
| DK. 5 /
berth 6 |
# 6 |
Portside to |
|
|
|
125 lbs |
|
none |
|
|
43.5 |
120,000 lt |
|
| Lat:
29° 43' 44.04" N |
|
|
|
|
|
|
|
|
|
|
| Long:
95° 1' 20.38" W |
|
|
|
|
|
|
|
all drafts @ " 0 " tide gauge |
|
| Dock
Facilities: |
|
|
|
updated: Nov. 18, 2010 |
|
|
|
|
|
All drafts incl. 1 ft
UKC |
|
|
|
|
|
Exxon Terminal Charges |
|
|
| Gangway
use: |
|
Vessel's accomodation
ladder |
|
1 |
mooring |
|
|
$1,800.00 |
|
< May 2011 |
|
|
|
|
|
|
2 |
shuttle bus service |
$300.00 |
|
< May 2011 |
|
| Bunkering
via Shoreline: |
No |
|
|
|
3 |
shifting |
|
|
$1,200.00 |
|
|
|
|
4 |
water |
|
|
$300.00 |
|
| Bunkering
via Barge: |
|
(only for ExxonMobil chartered vsls) |
|
5 |
wharfage ships |
|
$1,000.00 |
/hour |
|
|
6 |
wharfage barges |
$300.00 |
/hour |
|
| Ship's
stores at dockside: |
No |
|
7 |
ballast/slop discharge |
$5.00 |
/ bbl |
|
|
8 |
TVEL with approval |
4.5 hrs wharfage
min.,plus delays |
|
| Ship's
stores via barge: |
prior
approval: Bill Hennessey / ph#
281-834-3202 |
|
|
9 |
slop removal |
|
$800.00 |
testing charge engine slops |
| |
|
|
|
William.S.Hennessey@exxonmobil.com |
|
|
10 |
Fire & Emergency
Response |
$350.00 |
|
< May 2011 |
|
| Fresh water
available: |
Yes |
|
Bill cell# 281-229-1072 |
|
|
|
|
|
|
|
|
|
|
| Slop
Discharge Facility: |
Yes |
(currently unavailable
until further notice-call to check status) |
|
|
|
|
Pat Brown 281-834-4768 |
|
|
|
|
| Linehandlers: |
|
Terminals |
|
|
|
|
| Transit
time from Galveston Seabuoy to All Fast: |
5 hrs |
|
|
| Shore Line: |
|
|
| Gate Pass
Required: |
|
Yes |
email: btrfdocks@exxonmobil.com |
|
|
| COMMENTS: |
DK 5 ph# |
1-281-834-4480 |
|
|
|
Drafts are FW corrected to MLLW
based on 0.0 ft tide gauge at Morgan's Pt., includes 1 ft UKC |
|
|
security - SEE: |
Portinfo Brouchures /
File: ExxonMobile /
" Exxon-Baytown TWIC req." |
|
|
| Please
note: this information is correct to the best of our knowledge on Nov 18,
2011 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|