CEMEX  USA
16530 DeZavala Rd 
Houston, TX  77530
 
SBC  Dockops, LLC         as Marine Managers for Cemex USA
Main Telephone: N/A
Operations Fax: N/A
Dock Management : Melanie  Rodgers cell#  713-562-3727 e-mail : sbcdockops@unitedbulk.com
Elizabeth Augoustiniatos cell#  832-226-1071
Dock Information:                          
      HEADING   CONNECTIONS   PSI@MFOLD   AIR DRAFT   LOA BEAM DRAFT BCM SALINITY
Head in / Bulk 850 ft Panamax 28'
Portside to
after
"IKE"
Dock Facilities:                            
Gangway use: Terminal usd $  400  1st day /  $ 200 each day after
Guard Service: Yes /  if needed $20 per hour /  Overtime is $30 per hour and  (requires 24 hour advance notice)
Bunkering via Truck: usd $ 750  per unit, if taken
Bunkering via Barge: usd $  750 per unit, if taken
Pickup/Delivery Fee: usd $ 500 flat
Ship's stores via barge: N/A
Fresh water available: Yes usd $ 500 if taken
Slop Discharge Facility:
Linehandlers: Houston Mooring via direct bill through SBC Dockage only  $2,050
Transit time from Galveston Seabuoy to All Fast: 5 - 6 hours
Line Handling: usd $2,050 set with Houston Mooring, direct bill to SBC Dockops
Gate Pass Required: Yes  (** Must have names of all whom will attend**) Only accept gate list from the agent securing the dock, must be e-mailed as no fax at the terminal
Security Ph#: No phone at terminal
COMMENTS: Vacuvate System
If Vessel is gearless, need to rent crane to load front end loaders
Dockage:   $ 4,000/ calendar day (00:01-24:00)  1 day minimum / pro rated to 1/2 day after first 24 hours
Vessel must have proper gangway / If no terminal gangway must be utilized $400 fee for first day and $200 per day there after
CELL PHONE:   Vsl must have available on board 24 hrs
Berth  application  required. Must send berth app. ubst@unitedbulk.com
Please note: this information is correct to the best of our knowledge on    August 2, 2011